{"id":422,"date":"2025-03-04T13:09:57","date_gmt":"2025-03-04T13:09:57","guid":{"rendered":"https:\/\/pf-mgtandconst.com\/?page_id=422"},"modified":"2025-03-04T13:09:58","modified_gmt":"2025-03-04T13:09:58","slug":"mother-of-christ-catholic-school-parking-lot-expansion","status":"publish","type":"page","link":"https:\/\/pf-mgtandconst.com\/?page_id=422","title":{"rendered":"Mother of Christ Catholic School Parking Lot Expansion"},"content":{"rendered":"\n<p>PF Management &amp; Construction has been contracted to complete a parking lot expansion at Mother of Christ Catholic School, providing additional parking spaces and improving site functionality. The project includes demolition, sitework, installation of utilities, an underground drainage system, paving, curbing, signage, and striping, ensuring a well-planned and efficient expansion of the school&#8217;s parking facilities.<\/p>\n\n\n\n<p>All work will be completed in compliance with the Florida Building Code (FBC) and Miami-Dade County Public Works standards, ensuring a safe, durable, and functional parking facility. This expansion will enhance accessibility for students, staff, and visitors while optimizing the school&#8217;s overall traffic management.<\/p>\n\n\n\n<p>At PF Management &amp; Construction, we bring a well-rounded breadth of experience across a wide range of construction sectors, allowing us to deliver high-quality solutions tailored to each project\u2019s unique needs.<\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1020\" height=\"746\" data-id=\"425\" src=\"https:\/\/pf-mgtandconst.com\/wp-content\/uploads\/2025\/03\/1000653413.png\" alt=\"\" class=\"wp-image-425\" srcset=\"https:\/\/pf-mgtandconst.com\/wp-content\/uploads\/2025\/03\/1000653413.png 1020w, https:\/\/pf-mgtandconst.com\/wp-content\/uploads\/2025\/03\/1000653413-300x219.png 300w, https:\/\/pf-mgtandconst.com\/wp-content\/uploads\/2025\/03\/1000653413-768x562.png 768w, https:\/\/pf-mgtandconst.com\/wp-content\/uploads\/2025\/03\/1000653413-273x200.png 273w\" sizes=\"auto, (max-width: 1020px) 100vw, 1020px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"763\" data-id=\"423\" src=\"https:\/\/pf-mgtandconst.com\/wp-content\/uploads\/2025\/03\/1000653411-1024x763.png\" alt=\"\" class=\"wp-image-423\" srcset=\"https:\/\/pf-mgtandconst.com\/wp-content\/uploads\/2025\/03\/1000653411-1024x763.png 1024w, https:\/\/pf-mgtandconst.com\/wp-content\/uploads\/2025\/03\/1000653411-300x224.png 300w, https:\/\/pf-mgtandconst.com\/wp-content\/uploads\/2025\/03\/1000653411-768x572.png 768w, https:\/\/pf-mgtandconst.com\/wp-content\/uploads\/2025\/03\/1000653411-268x200.png 268w, https:\/\/pf-mgtandconst.com\/wp-content\/uploads\/2025\/03\/1000653411.png 1032w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"890\" height=\"565\" data-id=\"424\" src=\"https:\/\/pf-mgtandconst.com\/wp-content\/uploads\/2025\/03\/1000653412.png\" alt=\"\" class=\"wp-image-424\" srcset=\"https:\/\/pf-mgtandconst.com\/wp-content\/uploads\/2025\/03\/1000653412.png 890w, https:\/\/pf-mgtandconst.com\/wp-content\/uploads\/2025\/03\/1000653412-300x190.png 300w, https:\/\/pf-mgtandconst.com\/wp-content\/uploads\/2025\/03\/1000653412-768x488.png 768w, https:\/\/pf-mgtandconst.com\/wp-content\/uploads\/2025\/03\/1000653412-315x200.png 315w\" sizes=\"auto, (max-width: 890px) 100vw, 890px\" \/><\/figure>\n<\/figure>\n","protected":false},"excerpt":{"rendered":"<p>PF Management &amp; Construction has been contracted to complete a parking lot expansion at Mother of Christ Catholic School, providing additional parking spaces and improving site functionality. The project includes demolition, sitework, installation of utilities, an underground drainage system, paving, curbing, signage, and striping, ensuring a well-planned and efficient expansion &hellip;<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-422","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/pf-mgtandconst.com\/index.php?rest_route=\/wp\/v2\/pages\/422","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pf-mgtandconst.com\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/pf-mgtandconst.com\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/pf-mgtandconst.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/pf-mgtandconst.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=422"}],"version-history":[{"count":1,"href":"https:\/\/pf-mgtandconst.com\/index.php?rest_route=\/wp\/v2\/pages\/422\/revisions"}],"predecessor-version":[{"id":426,"href":"https:\/\/pf-mgtandconst.com\/index.php?rest_route=\/wp\/v2\/pages\/422\/revisions\/426"}],"wp:attachment":[{"href":"https:\/\/pf-mgtandconst.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=422"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}